MySTDF | STDF Conversion and Engineering Intelligence

Convert STDF at Scale. Analyze with Confidence.

MySTDF converts large STDF and archive files into structured, analysis-ready outputs, connects the converted data to wafer and yield analytics, and assists engineers with root-cause evidence, recommended actions, and automated reports.

Efficient local processing connects STDF conversion directly to wafer analysis, yield investigation, site comparison, AI-assisted root-cause analysis, and automated reporting.

STDF / Archive Transfer Tool SQLite / Excel / PPT Engineering Analytics Project Yield AI Evidence Auto Report
MySTDF Engineering Workspace LOCAL
Converted Files128SQLite + Excel
Wafer Yield97.84%Stable
Risk Tests123 high
Wafer PatternZ-score evidence
Yield TrendLot / wafer
Root-cause candidatesRanked evidence
  1. Site distribution shiftHigh
  2. Continuity tail behaviorMedium
  3. Edge-ring wafer patternMedium
MySTDF Transfer Tool converts tester output into reusable engineering data and report outputs.

STDF Conversion

Convert STDF Files into Analysis-Ready Outputs

MySTDF starts by converting raw STDF or archive files into structured outputs for downstream engineering analysis. The transfer engine is designed for large production files and uses efficient local processing without loading the complete dataset into memory.

Input: STDF / Archive Outputs: SQLite DB -> Excel -> PPT Report
  • STDF and compressed archive input
  • Chunked processing for large files
  • Per-file SQLite database output
  • Optional Excel output
  • Optional automated PPT reporting
  • Local processing without cloud upload
  • Transfer progress and detailed status log
  • Portable Windows deployment
  • No Python installation required for the packaged release
View Excel Output

Engineering-Ready Excel Output

STDF to Excel: Engineering-Ready Data, Not a Raw Dump

MySTDF converts STDF records into an engineering-oriented Excel workbook that combines test-item statistics, device-level metadata, and individual measurement values. Highlighted cells help engineers quickly identify failed or flagged results and trace them back to the corresponding device, site, bin, coordinate, and first-fail information.

The MySTDF Excel output combines test statistics, device metadata, and detailed measurement values in one engineering-friendly workbook.

Test-Level Statistics

Review limits, fail rate, Cpk, sigma, mean, percentiles, minimum, maximum, and device count for every exported test item.

Device-Level Traceability

Trace every value to its device number, site, hard bin, soft bin, wafer coordinate, first fail, last fail, and pass/fail status.

Fast Failure Localization

Highlighted results allow engineers to move quickly from an abnormal value to the affected test item and device without manually searching the complete workbook.

Conversion Pipeline

Convert Once. Reuse the Data Across Engineering Workflows.

The structured outputs become the reusable data foundation for TSR analysis, wafer maps, site comparison, bin analysis, correlation, project trends, and automated reporting.

01STDF / STDF.GZ / Archive
02Transfer Engine
03SQLite DB / Excel / PPT
04Engineering Analytics
05AI Root Cause
06Engineering Action

Engineering Analytics

One Test. Multiple Engineering Views.

MySTDF helps engineers understand one test through an integrated workspace that combines fail ranking, wafer map behavior, spatial distribution, zone trends, by-site comparison, and correlation-based pattern review.

The MySTDF analysis UI connects fail ranking, map behavior, distribution patterns, and correlation views in one synchronized engineering workflow.

Fail Ranking Table

Automatically prioritize failing items using fail percentage, AI classification, test type, limit behavior, discrete behavior, outlier signatures, and heavy-tail detection.

Map & Distribution

Review wafer maps, parametric distributions, zone trends, limits, and by-site behavior for fast spatial and statistical verification.

Correlation & Pattern

Identify related tests, high-correlation candidates, upstream behavior, and repeated engineering patterns.

Detailed Evidence

Explore the Detailed Engineering Evidence

Open the detailed analysis view to inspect fail patterns, parametric wafer behavior, center-to-edge trends, cumulative distributions, specification limits, and site variation.

Synchronized visual analysis helps engineers connect spatial patterns, distributions, specification limits, and site behavior.
Fail Wafer Map Parametric Wafer Map Zone and Edge Trend Cumulative Distribution By-Site Comparison

Project-Level Visibility

Project-Level Yield and Risk Visibility

Review lots, wafers, yield, hardware-bin loss, first-fail behavior, TSR results, and project trends before opening detailed per-file analysis.

The project catalog provides fast navigation and summary intelligence while detailed test results remain available in per-file databases.
Multi-lot and multi-wafer overview
Yield trend monitoring
Hardware-bin summary
First-fail analysis
Top-risk test identification
Project catalog status
Fast drill-down to detailed TSR analysis
Multi-database project support

AI Decision Summary

From Project Data to Decision-Ready Engineering Insight

MySTDF combines project yield, first-fail behavior, hardware-bin loss, ranked risk items, and engineering evidence into one decision-oriented summary. AI assists by organizing the evidence and prioritizing candidates while engineers retain control of the final conclusion.

MySTDF Decision Workspace

AI-Assisted Project Summary

Demo Data
Overall Yield82.9%Stable demo level
Total Samples10,993Demo devices
First Fail Items9Ranked candidates
Checked Scope3Lots / groups
HB Count11Hardware bins

Yield Trend and First-Fail Distribution

8 demo wafers
90% 86% 82% 78% DEMO-W01DEMO-W02DEMO-W03DEMO-W04 DEMO-W05DEMO-W06DEMO-W07DEMO-W08

Yield trend and first-fail distribution help engineers identify unstable wafers and dominant loss contributors.

Top Risk Items

Ranked risk
Rank First Fail HB Test FF %
1FF_001HB187DEMO_SUPPLY_CURRENTHigh 3.58%
2FF_002HB156DEMO_OUTPUT_LEVELMedium 3.16%
3FF_003HB156DEMO_CONTINUITY_POSMedium 2.58%
4FF_004HB42DEMO_ADC_LINEARITYLower 0.67%
5FF_005HB11DEMO_RF_GAINLower 0.60%

Key Insight

Illustrative AI-Assisted Summary
  • Yield recovered after an initial dip and is stable around 82-90%.
  • Nine first-fail items were detected; the top three contribute most of the observed loss.
  • Prioritize the highest-risk tests and verify their wafer, site, and hardware-bin evidence.

Wafer Performance Snapshot

Heatmap-style demo values
Wafer Yield % HB156 HB187 HB10 HB42 HB140 Weighted Avg.
DEMO-W0178.1%High 3.9High 4.1Mod 2.7Low 0.6Mod 1.82.62
DEMO-W0279.4%Mod 2.8High 3.4Mod 2.1Low 0.5Mod 1.52.06
DEMO-W0382.0%Mod 2.2Mod 2.4Low 1.0Low 0.4Low 0.91.38
DEMO-W0483.1%Low 1.4Mod 1.9Low 0.8Low 0.3Low 0.71.02
DEMO-W0584.0%Low 1.2Mod 1.6Low 0.7Low 0.2Low 0.60.86
DEMO-W0684.5%Low 1.1Low 1.3Low 0.6Low 0.2Low 0.50.74

First-Fail Detail

Short public demo table
First Fail HB Test FF %
FF_001HB187DEMO_SUPPLY_CURRENT3.58%
FF_002HB156DEMO_OUTPUT_LEVEL3.16%
FF_003HB156DEMO_CONTINUITY_POS2.58%
FF_004HB42DEMO_ADC_LINEARITY0.67%
FF_005HB11DEMO_RF_GAIN0.60%
Issue Detection

Yield, first fail, and AI grouping

Root-Cause Candidate

First-fail, hardware-bin, correlation, and pattern analysis

Evidence

Wafer maps, site behavior, distribution, and HB heatmap

Recommended Action

Focused verification and next engineering steps

Focus -> Prioritize -> Improve

Data-driven decision support for higher yield and faster time to resolution.

This public demo uses synthetic data to illustrate the MySTDF decision workflow.

AI Root-Cause Evidence

From Correlation to Root-Cause Evidence

MySTDF ranks upstream candidates using correlation, separation, lift, test role, and multi-view verification. Engineers can compare statistical relationships, distribution behavior, and supporting evidence before selecting the most likely root-cause candidate.

AI organizes and ranks the evidence. Engineers review the relationships, verify the supporting plots, and retain control of the final conclusion.

Illustrative Metrics
0.92Top Correlation
8.4Separation
9.6xLift
3Ranked Candidates
MySTDF connects ranked correlation evidence with distribution behavior, test roles, and multi-view verification to support a traceable engineering decision.
Summary

AI Root-Cause Summary

Summarize the target failure, statistical evidence, abnormal tail behavior, candidate type, investigation scope, and recommended next check.

  • Target failure summary
  • Outlier and tail evidence
  • Candidate type and role
  • Recommended next step
Ranking

Upstream Evidence Ranking

Rank upstream tests using correlation, separation, lift, role, and test type so engineers can focus on the strongest root-cause candidates first.

  • Correlation strength
  • Distribution separation
  • Lift score
  • Device / program / monitor role
Verification

Multi-View Verification

Verify each candidate using correlation plots, normalized probability plots, distribution shape, specification behavior, and consistency across multiple perspectives.

  • Relationship strength
  • Tail and pattern behavior
  • Specification-limit behavior
  • Cross-view consistency
Target Failure
Upstream Ranking
Multi-View Evidence
Root-Cause Candidate
Recommended Next Check

This public demo uses synthetic and anonymized data to illustrate the MySTDF evidence-ranking workflow.

Engineering Intelligence

From Engineering Evidence to Root-Cause Candidates

AI assists the investigation by organizing evidence, detecting patterns, and ranking root-cause candidates. Engineers retain visibility into the data, logic, and final decision.

01

Evidence

Correlation and Pattern Detection

  • Wafer, site, bin, and parametric verification
  • Upstream evidence ranking
  • Repeated pattern and outlier review
02

Confidence

Root-Cause Candidate Confidence

  • Candidate confidence scoring
  • Supporting evidence for each candidate
  • Traceable engineering assumptions
03

Decision Support

Recommended Next Checks

  • Recommended next check
  • Engineer-controlled final decisions
  • Focused paths into automated reporting

Auto Report

Decision-Ready Output, Not Just Exported Charts

The report structure follows the way engineers communicate a problem: issue, root-cause candidate, supporting evidence, confidence, and recommended action.

IssueRoot CauseEvidenceAction
  • Issue summary
  • Root-cause candidate and why
  • Supporting evidence
  • Confidence
  • Recommended action
  • Excel or presentation-ready output
MySTDF AUTO REPORTWafer Issue Summary
Decision Ready
Yield92.8%
Top FailHB 103
RiskHigh
Confidence0.86

Issue Summary

Yield loss is concentrated on one site with a repeated edge-ring wafer signature.

Root-Cause Candidate

Primary candidate: site-dependent contact or hardware path instability.

Supporting Evidence

Recommended Action

Verify the affected contact path, compare continuity distributions, and review impacted samples.

Adaptive Learning Engine

User-Driven Intelligence Without Constant Retraining

Engineering teams can keep classification and investigation logic current through durable configuration instead of rebuilding a large model for every mapping update.

User-defined role mapping

Map continuity, supply, scan, analog, IDDQ, RF, and custom test families to engineering roles.

Flexible keyword matching

Case-insensitive matching can evolve as naming styles, test programs, and product families change.

Persistent knowledge configuration

Reusable rules remain available for future analyses and automatically refresh new results.

Reusable engineering rules

Capture site, bin, wafer, parametric, and correlation behavior in repeatable investigation logic.

Automatic refresh

Future analyses can reflect updated mappings without manual report rewrites.

No constant retraining

Teams can update mappings and rules without rebuilding a model for each change.

Latest Release

Download the Latest MySTDF Release

Convert STDF files locally, generate structured analysis outputs, and explore the MySTDF engineering workflow without building custom scripts.

Portable Windows package | No Python installation required

Contact

Discuss a MySTDF use case.

Product inquiries, technical discussions, collaboration, and MySTDF demonstration requests.